|
|
REPRODUCTION OF ANNUAL TOWN REPORT FOR YEAR ENDED, 1884
OXFORD
TOWN
REPORT
FOR THE YEAR ENDING
September 15th, 1884.
----o---
SELECTMEN'S REPORT.
ROADS, BRIDGES AND RAILINGS
Roads worked by contract............................. $1,805.50
ROADS NOT ON CONTRACT Frank Beebe, cutting ice on river road................... $1.50
George Martin, " " ................... 1.75
Wm. O. French, " " ................... 2.00
Charles French, " " ................... 1.50
Beach J. Downs, work on road of James Wheeler............ 2.00
Beach J. Downs, " " Michael Fanning.......... 8.00
H. E Smith, blasting rocks............................... 2.00------------
$18.75BRIDGES AND RAILING. F. C. Candee, 2,000 feet plank, bill of 1883........................ $35.00
S. P. Sanford, 634 feet plank....................................... 11.10
H. B. Smith, labor on Eight-mile brook bridge....................... 2.00
Charles French, putting up railing.................................. 1.50
H. E. Smith, 112 feet plank for sluice, and putting in.............. 2.96
D C. Riggs, carting plank........................................... 1.25
David C. Riggs, spikes.............................................. 70
David C. Riggs, 144 bolts........................................... 14.75
C. E. Lum, 138 feet railing at 5 cts................................ 6.90
C. E. Lum, 14 posts................................................. 4.20
Wm. 0. French, 5 days putting up railing on River and Forge road.... 7.50
W. 0. Davis, putting in sluice on Chestnut Tree Hill, two men & team 5.00
W. 0. Davis, putting in stone sluice................................ 10.00
Meigs Bros., 84 feet plank at l 3/4 cts............................. 1.48
Meigs Bros., labor on bridge........................................ 80
C. B. Flagg, 28 feet plank.......................................... 49
C. B. Flagg, sleepers............................................... 3.00
C. B. Flagg, spikes................................................. 10
C. B. Flagg, labor on bridges....................................... 2.50
John Church, 499 feet sleepers and plank at 13/4 cts................ 8.61
John Church, 180 feet timber at 1 1/4 cts........................... 2.25
John Church, 200 feet timber at 1 1/4 cts........................... 2.50
John Church, 42 feet railing........................................ 2.10
|
|